کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
11017529 1725873 2018 10 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Blast-induced rock damage control in Fangchenggang nuclear power station, China
موضوعات مرتبط
مهندسی و علوم پایه علوم زمین و سیارات مهندسی ژئوتکنیک و زمین شناسی مهندسی
پیش نمایش صفحه اول مقاله
Blast-induced rock damage control in Fangchenggang nuclear power station, China
چکیده انگلیسی
In the process of blasting excavation, stress wave propagation and gas expansion can basically induce damage to surrounding rocks, which is detrimental to rock mass integrity and engineering safety. In this case, evaluation and control of blast-induced effects are essential to the safety of nearby buildings and integrity of bedrock in blasting field. In Fangchenggang nuclear power station of China, the drill-and-blast method was employed for bedrock excavation. In order to reduce the blast-induced damage zone, the wave propagation and associated damage to rock mass should be carefully investigated. In this paper, the wave propagation regressively obtained from field monitoring data was presented based on empirical formula (e.g. Sadovsky formula). The relationship between the peak particle velocity (PPV) at a distance of 30 m away from the charge hole and charge per delay in blast design was derived. Meanwhile, the acoustic tests before and after blasting were conducted to determine the damage depth of rock mass. The charge per delay in blast design was then calibrated based on the blast-induced wave propagation regularity. The results showed that a satisfactory effect was achieved on blast-induced damage control of rock mass. This could be helpful to rock damage control in similar blasting projects.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Journal of Rock Mechanics and Geotechnical Engineering - Volume 10, Issue 5, October 2018, Pages 914-923
نویسندگان
, , , , , ,