کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
11263441 1701181 2019 8 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Assessment of drilling deviations in underground operations
ترجمه فارسی عنوان
ارزیابی انحرافات حفاری در عملیات زیرزمینی
موضوعات مرتبط
مهندسی و علوم پایه علوم زمین و سیارات مهندسی ژئوتکنیک و زمین شناسی مهندسی
چکیده انگلیسی
At present, modern jumbos equipped with MWD (Measure While Drilling) provide the position of the blastholes collar and, from the drill length and the azimuth and inclination angles (monitored outside the blasthole), the theoretical end position of the blasthole. Since the trajectory of the hole during the drill is not measured, deviations are not accounted with the result that the actual spatial position of the blasthole is unknown. This paper investigates the quality of the drilling in underground blasting operations with a view to quantify the distance of the position assessed by the MWD system with respect to the actual end position of the blasthole logged. For that, a Pulsar Micro Probe Mk3 has been used to measure the actual trajectory of several production blastholes, drilled in semi-automatic mode, by measuring inclination and azimuth values at 1 m intervals. The results indicate significant deviations between the actual end position of the blastholes and the end position given by the MWD system. Deviation measurements are compared with the MWD parameters. This points out that possible disturbance zones in the rock, indicated by peaks and drops in the variability of the rotation pressure and in the signals of feed and hammer pressure, are correlated with changes in the blasthole trajectory.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Tunnelling and Underground Space Technology - Volume 83, January 2019, Pages 254-261
نویسندگان
, , , , ,