کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
294862 511498 2009 5 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Integration of real options into short-term mine planning and production scheduling
موضوعات مرتبط
مهندسی و علوم پایه علوم زمین و سیارات زمین شناسی اقتصادی
پیش نمایش صفحه اول مقاله
Integration of real options into short-term mine planning and production scheduling
چکیده انگلیسی

Commodity prices have fallen sharply due to the global financial crisis. This has adversely affected the viability of some mining projects, including leading to the possibility of bankruptcy for some companies. These price falls reflect uncertainties and risks associated with mining projects. In recent years, much work has been published related to the application of real options pricing theory to value life-of-mine plans in response to long term financial uncertainty and risk. However, there are uncertainties and risks associated with medium/short-term mining operations. Real options theory can also be applied to tactical decisions involving uncertainties and risks. This paper will investigate the application of real options in the mining industry and present a methodology developed at University of Queensland, Australia, for integrating real options into medium/short-term mine planning and production scheduling. A case study will demonstrate the validity and usefulness of the methodology and techniques developed.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Mining Science and Technology (China) - Volume 19, Issue 5, September 2009, Pages 674-678