کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
6763600 1431571 2019 10 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Assessing solution quality and computational performance in the long-term generation scheduling problem considering different hydro production function approaches
ترجمه فارسی عنوان
ارزیابی کیفیت راه حل و عملکرد محاسباتی در مسائل مربوط به برنامه ریزی تولید بلند مدت با توجه به رویکردهای تابع تولید آب های مختلف
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی انرژی های تجدید پذیر، توسعه پایدار و محیط زیست
چکیده انگلیسی
The long-term generation scheduling (LTGS) problem aims at finding a generation policy that minimizes an objective function over a multi-year planning horizon. A crucial aspect of this problem is the Hydropower Production Function (HPF), which relates power with head, turbined outflow, and efficiency of the generating units. Given that the LTGS is a large-scale stochastic optimization problem, the HPF is modeled in a simplified manner. However, considering the high-performance computers currently available and the recent advances in stochastic optimization algorithms, it is possible to enhance the HPF modeling to use the energy resources more efficiently. This paper proposes a piecewise linear model of HPF that considers the plant generation as a function of the volume and the total outflow. Unlike previous works, the HPF also considers the (nonlinear) efficiency function of each generating unit. The paper also presents a comparison between the proposed HPF and a one-dimensional HPF known as constant productivity. The generation policy and the computational burden are analyzed using an optimization-simulation process based on Stochastic Dual Dynamic Programming algorithm. The computational tests use data of a large-scale electrical power system, which corresponds to about 90% of the Brazilian system.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Renewable Energy - Volume 131, February 2019, Pages 45-54
نویسندگان
, , ,