Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
10128869 | Annals of Nuclear Energy | 2018 | 12 Pages |
Abstract
Part I of series of two papers analyses the plant response in case of hypothetical station blackout severe accident. Assessment of accident management measures in the preventive and in the mitigative domain is performed, where a focus is given on the combination of primary pressure reduction and injection by portable equipment directly into the reactor circuit. Key timings for operator actions are deduced. Both positive and negative effects of the investigated accident management measures are discussed. The results from the station blackout simulations showed that the time until core degradation can be delayed by application of primary side depressurization and usage of mobile pump as accident management measures. Depending on the time of injection significant reduction of the hydrogen and fission products releases can be obtained. In case that early water injection is possible, severe core damage might be prevented.
Related Topics
Physical Sciences and Engineering
Energy
Energy Engineering and Power Technology
Authors
P. Wilhelm, M. Jobst, Y. Kozmenkov, F. Schäfer, S. Kliem,