| Article ID | Journal | Published Year | Pages | File Type |
|---|---|---|---|---|
| 10280044 | Minerals Engineering | 2005 | 11 Pages |
Abstract
The history and implementation methodology is described, and the results-increases in throughput and gold recovery-are analysed. The improved control of particle size makes it possible to maximise gold recovery. This is discussed and illustrated.
Related Topics
Physical Sciences and Engineering
Chemical Engineering
Chemical Engineering (General)
Authors
Christophe Bouché, Carol Brandt, Alain Broussaud, van Wayne Drunick,
