Article ID Journal Published Year Pages File Type
10286216 Energy and Buildings 2005 13 Pages PDF
Abstract
The incentive of the BEPM can be deduced from a simple life cycle costing analysis. It assumes an inflation rate and bank interest rate of 8 and 10%, respectively, the total net present value (NPV) for the original airside system is higher than that employing the BEPM by HK$ 19,700,000 for 20 years of operation.
Related Topics
Physical Sciences and Engineering Energy Renewable Energy, Sustainability and the Environment
Authors
, ,