Article ID Journal Published Year Pages File Type
10296507 Tunnelling and Underground Space Technology 2005 8 Pages PDF
Abstract
In this study, a methodology to determine an optimal support pattern and advance rate for the design of a tunnel is introduced based on risk analysis. It can be confirmed quantitatively that the more the tunnel is supported, the higher the reliability index becomes and the more stable the tunnel is predicted to be. Also an optimal support pattern and advance rate can be determined quantitatively by performing a risk analysis considering the construction cost and the cost of losses that can occur due to the collapse of a tunnel.
Related Topics
Physical Sciences and Engineering Earth and Planetary Sciences Geotechnical Engineering and Engineering Geology
Authors
, , ,