Article ID Journal Published Year Pages File Type
10296825 Tunnelling and Underground Space Technology 2005 9 Pages PDF
Abstract
Ome Tunnel is a double-tier highway tunnel with large cross-section of 220-260 m2 excavated at a shallow depth in unconsolidated ground. The tunnel was excavated by NATM. Since the tunnel passes under a road in dense residential area, surface settlement due to tunneling was restricted. Therefore, various auxiliary construction method such as long span steel pipe fore-piling with injection was adopted based on monitoring and analyzing ground behavior during construction. A total of 1060 m of tunneling work was successfully completed without major interruption of work excessive damage on surface residents and other facilities.
Related Topics
Physical Sciences and Engineering Earth and Planetary Sciences Geotechnical Engineering and Engineering Geology