Article ID Journal Published Year Pages File Type
10296829 Tunnelling and Underground Space Technology 2005 7 Pages PDF
Abstract
This paper introduces the results of measurements made over a period of 14 years after the Seikan Tunnel was opened for service. Because this tunnel is a very long undersea tunnel with the length of 54 km, the necessity of clarifying the long-term behavior of the tunnel structure was recognized from the start. Various measurements are made to survey the condition of the ground and lining concrete and data thus obtained are used to assess the soundness of the tunnel structure. Judging from the data thus far obtained, the tunnel structure appears to remain in a good condition.
Related Topics
Physical Sciences and Engineering Earth and Planetary Sciences Geotechnical Engineering and Engineering Geology
Authors
,