Article ID Journal Published Year Pages File Type
1029782 Energy Strategy Reviews 2016 10 Pages PDF
Abstract

•Day ahead electricity market price proxy long-term simulation.•Intraday electricity market price proxy long-term simulation.•Dynamic stochastic programming algorithm for the simulation of operation of a hydro pumped-storage operation simulation.•Financial and economic calculation of hydro pumped-storage value in the long-term.•Methodology development for the valuation of a storage power plant in the long-term.

During the last two decades, an evolving market structure is recognised starting from the spot market and its derivatives, resulting to several other markets such as the Intraday Market (IM), the Balancing Market (BM) and the Reserve Capacity Market (RCM). The participation in these markets has changed significantly the operation policy of the plants and, consequently, their value in the market. The current paper deals with the problem of the long-term valuation of a Hydroelectric Pump Storage (HPS) plant participating in the DAM and IM. For this purpose, an appropriate methodology has been developed while it is demonstrated on a real case study concerning the operation of a Swiss based HPS plant that participates in the DAM and IM of the German electricity market, for a horizon of thirty-five (35) years.

Related Topics
Physical Sciences and Engineering Energy Energy (General)
Authors
, ,