Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
10386168 | Desalination | 2010 | 6 Pages |
Abstract
The experiments conducted to verify the settling, by measuring the volume of muds indicator, showed that the settling is made in proper conditions, assured by controlling this indicator regularly.
Keywords
Related Topics
Physical Sciences and Engineering
Chemical Engineering
Filtration and Separation
Authors
Souheila Ghizellaoui, Samira Ghizellaoui,