Article ID Journal Published Year Pages File Type
10402140 The Electricity Journal 2014 10 Pages PDF
Abstract
Issues of eminent domain often prevent the development of new transmission needed to link renewable generation to load centers. A new method for landowner compensation in transmission siting, called the Special Purpose Development Corporation, can bypass these bottlenecks by reducing costs of landowner opposition through the alignment of landowner interests with transmission development.
Related Topics
Physical Sciences and Engineering Energy Energy Engineering and Power Technology
Authors
,