Article ID Journal Published Year Pages File Type
10429203 Tsinghua Science & Technology 2005 7 Pages PDF
Abstract
Project boundary setting and leakage treatment are two important issues to be considered when a clean development mechanism (CDM) project is being designed. There are still many uncertainties concerning these two issues. This paper reviews the concepts of project boundary setting and leakage in CDM projects, cites the types and sources of leakage, discusses the principles for determining leakage, and gives some proposed methods for dealing with leakage. A case study, using several steps to solve the boundary and leakage problems, shows how the analyzed principles and treatments can be implemented in a real project. Based on the result of the case study, the methods discussed are shown to be appropriate for settling leakage issues.
Related Topics
Physical Sciences and Engineering Engineering Engineering (General)
Authors
, , , ,