Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
10508046 | Resources, Conservation and Recycling | 2015 | 7 Pages |
Abstract
- A number of ecodesign measures have been identified for hydropower projects.
- Ecodesign led to cumulative savings of 10.4% and 2.6% for GWP and ARDP burdens.
- The LCA standards 1% materiality threshold under-estimated total project burdens.
- Ecodesign can promote locally sourced materials and time savings in construction.
Keywords
Related Topics
Physical Sciences and Engineering
Energy
Renewable Energy, Sustainability and the Environment
Authors
John Gallagher, David Styles, Aonghus McNabola, A. Prysor Williams,