Article ID Journal Published Year Pages File Type
10508046 Resources, Conservation and Recycling 2015 7 Pages PDF
Abstract

- A number of ecodesign measures have been identified for hydropower projects.
- Ecodesign led to cumulative savings of 10.4% and 2.6% for GWP and ARDP burdens.
- The LCA standards 1% materiality threshold under-estimated total project burdens.
- Ecodesign can promote locally sourced materials and time savings in construction.
Related Topics
Physical Sciences and Engineering Energy Renewable Energy, Sustainability and the Environment
Authors
, , , ,