Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
10523009 | Computers & Industrial Engineering | 2005 | 9 Pages |
Abstract
The paper deals with the problem of finding a job sequence that minimizes the makespan in m-machine flow shops under the no-idle condition. This condition requires that each machine must process jobs without any interruption from the start of processing the first job to the completion of processing the last job. Since the problem is NP-hard, we propose a constructive heuristic for solving it that significantly outperforms heuristics known so far.
Related Topics
Physical Sciences and Engineering
Engineering
Industrial and Manufacturing Engineering
Authors
Pawel Jan Kalczynski, Jerzy Kamburowski,