Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
10523042 | Computers & Industrial Engineering | 2011 | 7 Pages |
Abstract
⺠Optimal solution methods for scheduling transshipment operations in cross docks are applicable for small size problems. ⺠Heuristics find almost optimal solutions with a gain of 10% to 60% in execution time compared to optimal methods. ⺠Hybrid heuristics further enhance the performance.
Related Topics
Physical Sciences and Engineering
Engineering
Industrial and Manufacturing Engineering
Authors
Gülgün Alpan, Anne-Laure Ladier, Rim Larbi, Bernard Penz,