Article ID Journal Published Year Pages File Type
10523961 Operations Research Letters 2013 4 Pages PDF
Abstract
We consider an environment with m machines in parallel operating at different speeds. The processing requirements of all jobs are independent and have the same exponential distribution. Job j may only be processed on a specific subset of the m machines, referred to as its restricted set. The restricted sets are nested and preemptions are allowed. We show that the Least Flexible Job to the Fastest Machine (LFJ-FM) minimizes the expected makespan and the total expected completion time.
Related Topics
Physical Sciences and Engineering Mathematics Discrete Mathematics and Combinatorics
Authors
, ,