Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
10523994 | Operations Research Letters | 2005 | 6 Pages |
Abstract
This paper considers a two-stage flexible flowshop scheduling problem with no waiting time between two sequential operations of a job and no idle time between two consecutive processed jobs on machines of the second stage. We show its complexity and present a heuristic algorithm with asymptotically tight error bounds.
Related Topics
Physical Sciences and Engineering
Mathematics
Discrete Mathematics and Combinatorics
Authors
Zhenbo Wang, Wenxun Xing, Fengshan Bai,