Article ID Journal Published Year Pages File Type
10674756 Nuclear Instruments and Methods in Physics Research Section B: Beam Interactions with Materials and Atoms 2013 9 Pages PDF
Abstract
In preparation for ANURIB, a low energy ISOL type facility has been built around the existing K130 cyclotron at VECC. Developed for the past decade, this facility was aimed at completing major R&D steps involved in the construction of ANURIB. Presently this facility accelerates beams up to energy of 415 keV/u and recently first radioactive beams have been produced. Development of a 10 MeV Injector Cryo Module for the e-Linac has been started in collaboration with TRIUMF. In this paper the plans for ANURIB project and present status of the R&D activities will be presented.
Related Topics
Physical Sciences and Engineering Materials Science Surfaces, Coatings and Films
Authors
, , , , , ,