Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
10677131 | Journal of Manufacturing Systems | 2012 | 11 Pages |
Abstract
⺠The research focuses on production system design when the machine reliability parameters are unknown. ⺠We explore why the system throughput is often overestimated when modeling a production system before the system is built. ⺠We provide the probability, expected value and upper bound of throughput overestimation.
Related Topics
Physical Sciences and Engineering
Engineering
Control and Systems Engineering
Authors
Ningjian Huang,