| Article ID | Journal | Published Year | Pages | File Type |
|---|---|---|---|---|
| 10682231 | Ocean Engineering | 2005 | 16 Pages |
Abstract
This paper will focus on the design issues, rope design, manufacturing, qualification and testing, and the IMRR plan that was developed to provide the assurance that the polyester mooring system could be safely operated over the 20-year field life.
Related Topics
Physical Sciences and Engineering
Engineering
Ocean Engineering
Authors
David Petruska, Jeff Geyer, Rick Macon, Michael Craig, Alex Ran, Neil Schulz,
