Article ID Journal Published Year Pages File Type
10688301 Journal of Cleaner Production 2005 8 Pages PDF
Abstract
It is important to develop a model or method for developing a priority for industrialists to work with in initiating cleaner production activities. This was done in Iran using the “multiple criteria decision making method” (MCDM). This included, among other things, interviewing the relevant experts and directors, for each industrial group. A relative ranking score was developed and based upon it, the priority of each group was determined. Within this process, the industrial groups of “textiles, apparel and leather industries” were given the highest priority and the industrial group of “manufacture of wood and wood products, including furniture” were given the lowest priority.
Related Topics
Physical Sciences and Engineering Energy Renewable Energy, Sustainability and the Environment
Authors
,