Article ID Journal Published Year Pages File Type
11029542 Journal of Manufacturing Systems 2018 10 Pages PDF
Abstract
Cold standby redundant systems are widely applied in processes requiring high reliability. When continuous monitoring is not possible, periodic inspections are employed to verify the components' condition and prevent system failures. This paper aims to develop a Monte Carlo simulation model to analyze and optimize the time interval between periodic inspections in cold standby systems considering the required availability and the lowest cost possible. Times-to-system-failure and their respective total cost per cycle were modeled and simulated. After determining the simulation error, a sensitivity analysis was conducted in order to verify the parameters effects in the optimal time interval between inspections. As a result, a simulation model was developed and can be used to optimize time intervals between periodic inspections of different cold standby systems. The main advantage of this method is the ability of considering any probability distribution to represent the times-to-failure and times-to-repair, not being limited to the exponential distribution.
Related Topics
Physical Sciences and Engineering Engineering Control and Systems Engineering
Authors
, ,