Article ID Journal Published Year Pages File Type
1133454 Computers & Industrial Engineering 2015 12 Pages PDF
Abstract

•A new real-time disruption recovery plan is developed.•An imperfect production-inventory system is considered.•A new mathematical and dynamic solution approach is developed for managing disruptions.•We solved the problem for the both single and multiple disruptions on a real-time basis.•We compared the results for a good number of randomly generated disruption test problems.

In this paper, a disruption recovery model is developed for an imperfect single-stage production–inventory system. For it, the system may unexpectedly face either a single disruption or a mix of multiple dependent and/or independent disruptions. The system is usually run according to a user defined production–inventory policy. We have formulated a mathematical model for rescheduling the production plan, after the occurrence of a single disruption, which maximizes the total profit during the recovery time window. The model thereby generates a revised plan after the occurrence of the disruption. The mathematical model, developed for a single disruption, is solved by using both a pattern search and a genetic algorithm, and the results are compared using a good number of randomly generated disruption test problems. We also consider multiple disruptions, that occur one after another as a series, for which a new occurrence may or may not affect the revised plan of earlier occurrences. We have developed a new dynamic solution approach that is capable of dealing with multiple disruptions on a real-time basis. Some numerical examples and a set of sensitivity analysis are presented to explain the usefulness and benefits of the developed model. The proposed quantitative approach helps decision makers to make prompt and accurate decisions for managing disruption.

Related Topics
Physical Sciences and Engineering Engineering Industrial and Manufacturing Engineering
Authors
, , ,