Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
1133910 | Computers & Industrial Engineering | 2014 | 8 Pages |
Abstract
Three dedicated machine heuristics are proposed herein for the problem and have been evaluated by comparing with the current scheduling method used in the case plant. The computational results show that the proposed constructive heuristics outperform the current scheduling method with significant improvements and can be used to solve large-size problems in reasonable computational times.
Related Topics
Physical Sciences and Engineering
Engineering
Industrial and Manufacturing Engineering
Authors
Cheng-Hsiung Lee, Ching-Jong Liao, Chien-Wen Chao,