Article ID Journal Published Year Pages File Type
1134594 Computers & Industrial Engineering 2012 11 Pages PDF
Abstract
► A model to simultaneously plan earth recycling and truck dispatching is developed. ► Actual operating conditions are successfully considered. ► A heuristic algorithm using problem decomposition and relaxation is proposed to efficiently solve the model. ► The error gap between the exact method and the heuristic method is only 0.5% in the case study. ► Recycling earth materials increases profitability for contractors and reduces environmental impact.
Related Topics
Physical Sciences and Engineering Engineering Industrial and Manufacturing Engineering
Authors
, , ,