Article ID Journal Published Year Pages File Type
1134741 Computers & Industrial Engineering 2010 5 Pages PDF
Abstract
In this paper we consider single machine SLK due date assignment scheduling problem with a rate-modifying activity. In this model, the machine has a rate-modifying activity that can change the processing rate of machine under consideration. Hence the actual processing times of jobs vary depending on whether the job is scheduled before or after the rate-modifying activity. We need to make a decision on when to schedule the rate-modifying activity, the optimal common flow allowance and the sequence of jobs to minimize total earliness, tardiness and common flow allowance cost. We introduce an efficient (polynomial time) solution for this problem.
Related Topics
Physical Sciences and Engineering Engineering Industrial and Manufacturing Engineering
Authors
, ,