Article ID Journal Published Year Pages File Type
1134783 Computers & Industrial Engineering 2011 5 Pages PDF
Abstract

In this paper, we study an unrelated parallel machine scheduling problem with setup time and learning effects simultaneously. The setup time is proportional to the length of the already processed jobs. That is, the setup time of each job is past-sequence-dependent. The objectives are to minimize the total absolute deviation of job completion times and the total load on all machines, respectively. We show that the proposed problem is polynomially solvable. We also discuss two special cases of the problem and show that they can be optimally solved by lower order algorithms.

Related Topics
Physical Sciences and Engineering Engineering Industrial and Manufacturing Engineering