Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
1134961 | Computers & Industrial Engineering | 2011 | 5 Pages |
Abstract
In this study, we consider an n-job, m-machine flow shop scheduling problem with decreasing time-dependent job processing times. By the decreasing time-dependent job processing times, we mean that the processing time is a decreasing function of its execution starting time. When some dominant relationships between m − 1 machines can be satisfied, we show that the makespan minimization problem can be solved in polynomial time.
Related Topics
Physical Sciences and Engineering
Engineering
Industrial and Manufacturing Engineering
Authors
Xiao-Yuan Wang, Ming-Zheng Wang, Ji-Bo Wang,