Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
1135286 | Computers & Industrial Engineering | 2009 | 17 Pages |
Abstract
The intent of this paper is to present a new metric for measuring multi-item multi-level schedule instability under rolling schedules and to compare it with the previous measures in literature. The new metric composed of linear combination of four sub-instability measures separates quantity and timing changes for both scheduled receipts (SRs) and planned orders (PORs). The new metric is tested by a detailed numerical example taken from literature, and results of simulation studies under various experimental factors are presented at the end of the study.
Keywords
Related Topics
Physical Sciences and Engineering
Engineering
Industrial and Manufacturing Engineering
Authors
Kamil Erkan Kabak, Arslan M. Ornek,