Abstract
⺠We consider single-machine scheduling with fixed delivery dates. ⺠The delivery dates are given or determined before the jobs are processed. ⺠The objective is to minimize the total weighted flowtime of the jobs. ⺠The heuristic applies the largest ratio first rule to schedule the jobs. ⺠We investigate the performance bounds of the heuristic.
Keywords