Article ID Journal Published Year Pages File Type
1135529 Computers & Industrial Engineering 2009 5 Pages PDF
Abstract

In a recent paper [Theoretical Computer Science 363, 257–265], He, Zhong and Gu considered the non-resumable case of the scheduling problem with a fixed non-availability interval under the non-resumable scenario. They proposed a polynomial time approximation scheme (PTAS) to minimize the total completion time.In this paper, we propose a fully polynomial-time approximation scheme to minimize the total weighted completion time. The FPTAS has O(n2/ε2)O(n2/ε2) time complexity, where nn is the number of jobs and εε is the required error bound. The proposed FPTAS outperforms all the previous approximation algorithms designed for this problem and its running time is strongly polynomial.

Related Topics
Physical Sciences and Engineering Engineering Industrial and Manufacturing Engineering
Authors
, ,