Article ID Journal Published Year Pages File Type
1135548 Computers & Industrial Engineering 2008 9 Pages PDF
Abstract

In this paper, we deal with a U-shaped production line with multiple heterogeneous multi-function workers. Skills of workers are assumed to be different. We consider an optimization problem for finding an allocation of workers to the line that minimizes the overall cycle time under the minimum number of workers satisfying the demand. All of processing, operation and walking times are deterministic. We propose an algorithm for computing an optimal allocation of workers to machines.

Related Topics
Physical Sciences and Engineering Engineering Industrial and Manufacturing Engineering
Authors
, ,