Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
1144148 | Systems Engineering Procedia | 2011 | 7 Pages |
Abstract
According to the characteristics of BT engineering projects and land level development, the paper introduces the problem of risk analysis and risk evaluation of binding modes. The risk assessment model of binding mode is established through using AHP and fuzzy comprehensive evaluation method. It provides theoretical and practical value for more similar projects.
Related Topics
Physical Sciences and Engineering
Engineering
Control and Systems Engineering