Article ID Journal Published Year Pages File Type
1458016 Cement and Concrete Research 2006 6 Pages PDF
Abstract

This paper presents the use of different techniques to assess the amounts of the main mineralogical phases in Portland cement clinker. The amounts measured by quantitative XRD analysis (Rietveld) show differences when compared to the Bogue calculation and this is particularly notable for the ferrite phase within certain clinkers. The amount of elemental substitution within the major clinker phases was determined by SEM-EDS microanalyses and the results show that defined amounts of iron oxide can be incorporated within the alite, belite and aluminate phases. Therefore even if a significant amount of the ferrite phase is expected due to the Bogue calculation, it is quite possible that less or no ferrite will be formed during clinker production.

Related Topics
Physical Sciences and Engineering Engineering Industrial and Manufacturing Engineering
Authors
, , ,