Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
1511631 | Energy Procedia | 2014 | 10 Pages |
Abstract
Evaluations of implemented Solar Home Systems (SHSs) almost never been carried out in Aceh. Most of SHS projects have been claimed to be failed despite there are no data explaining the failure. A study was performed to identify condition and performance of SHSspost installation in Deah Mamplam village, Aceh. After 6 years installation almost three-fourths of the systems are in good physical and operational condition although most are in temporary inoperative. The research demonstrated that the absence of program dissemination and user training prior to delivery and installation has contributed to the low awareness and knowledge of the system.
Related Topics
Physical Sciences and Engineering
Energy
Energy (General)