Article ID Journal Published Year Pages File Type
1558777 Procedia Structural Integrity 2016 8 Pages PDF
Abstract
The analysis carried out allows concluding that the failure of the component took place by fatigue. Fracture was initiated at the 1st/2nd thread of the component, close to the screw joint. The variable load acted perpendicularly to the plane of symmetry of the component. Corrosion took place simultaneously with fatigue crack propagation speeding the failure process. The inclusions present in the steel, mainly those that intercept the component surface, as well as the surface notches due to hot rolling, enhanced the disclosure of the fatigue process leading to premature failure of the component.
Related Topics
Physical Sciences and Engineering Materials Science Materials Chemistry
Authors
, ,