Article ID Journal Published Year Pages File Type
167786 Chinese Journal of Chemical Engineering 2012 7 Pages PDF
Abstract

In the literature, many works on determining inspection interval by the delay time concept generally assumed that the time of inspection span and the time of failure renewal are negligible. However, in realistic cases, the above time should not be neglected for both the time itself and its effect. In order to model the effect of the possible overlapping of inspection span with failure downtime on determining the optimal inspection interval, we propose a block-based inspection model for a single component-based on delay time concept. We further compare this model with the age-based model to show the practical sense. The developed models are also demonstrated by numerical examples.

Related Topics
Physical Sciences and Engineering Chemical Engineering Chemical Engineering (General)