Article ID Journal Published Year Pages File Type
1679409 CIRP Journal of Manufacturing Science and Technology 2009 7 Pages PDF
Abstract

Manufacturers of production facilities must not only be able to support their customers actively throughout the life cycle by optimizing machines and productivity but also by establishing a profitable environment for product-accompanying services. Therefore, a method has been developed which allows for the calculation of the costs of service contracts during the offer phase. Subject to different influencing variables which are deposited with stochastic distributions, the costs will be determined by the Monte Carlo method. The Monte Carlo method is used to estimate uncertain forecasts.

Related Topics
Physical Sciences and Engineering Engineering Industrial and Manufacturing Engineering
Authors
, ,