Article ID Journal Published Year Pages File Type
1698716 Procedia CIRP 2016 7 Pages PDF
Abstract

In the past, factory improvement measures have focused on cost optimization and agility increases, while neglecting the potential effects on material and energy efficiency. Production lot sizes, for example, have been determined solely with respect to cost and logistical performance. This paper presents a method to simulate material and energy efficiency in the factory as a function of lot size. Using the example of a plastics manufacturer, the simulation results reveal a gap between the lean optimum lot size and the material efficiency optimum.

Related Topics
Physical Sciences and Engineering Engineering Industrial and Manufacturing Engineering
Authors
, , ,