Article ID Journal Published Year Pages File Type
1700423 Procedia CIRP 2014 6 Pages PDF
Abstract

Product complexity leads to increased unpredictability of indices related to manufacturing performance estimation. This phenomenon is intensified in companies that produce engineered-to-order products, such as the knowledge and labour intensive mould-making industry. During the initial capturing of product specifications formalisation difficulties arise. Moreover, the estimation of delivery times for new moulding project is solely based on the engineers’ experience. A methodology, which has been developed into a software tool is proposed that exposes graphical interfaces for customers to submit new orders and establish a formalised communication with the engineering team. The collected data are stored in a knowledge repository and are processed by a case-based reasoning mechanism for the lead time estimation. A real-life pilot installation has been initiated to a mould making SME. Preliminary results depict a significant reduction in the number of iterations between customers and engineering department compared to the traditional approach followed by the company, and improved accuracy of lead time estimation.

Related Topics
Physical Sciences and Engineering Engineering Industrial and Manufacturing Engineering