Article ID Journal Published Year Pages File Type
1700696 Procedia CIRP 2014 6 Pages PDF
Abstract

While the IPS2-Execution System (IPS2-ES) supports the IPS2 provider during the IPS2 delivery, there is still no adequate tool to measure and evaluate the performance of the organization of the IPS2 delivery system. Especially the complexity of the automatic planning and control mechanisms of the IPS2-ES leads to the problem that the output of the system cannot be manually controlled. Hence, an automated method has to be designed to measure and rate the resulting IPS2 with a focus on IPS2 delivery planning and the IPS2 network. This paper presents a concept for an IPS2 performance measurement method for the organization of the IPS2 delivery. It considers resource planning, partner network and IT. Key figures have an important role for the performance concept and will be introduced in the concept. Additionally, a prototypical software implementation will be demonstrated.

Related Topics
Physical Sciences and Engineering Engineering Industrial and Manufacturing Engineering