Article ID Journal Published Year Pages File Type
1703676 Applied Mathematical Modelling 2014 9 Pages PDF
Abstract

This paper investigates the multi-mode resource availability cost problem with recruitment and release dates for resources. This problem is a more realistic model and extended case of the resource availability cost problem. The project contains activities interrelated by finish–start precedence relations with zero time lags, which require a set of renewable resources. First, a mixed integer programming formulation is proposed for the problem. Then, simulated annealing (SA) algorithm is proposed to obtain a satisfying solution for this NP-hard problem. The effectiveness of the proposed algorithm is demonstrated through comprehensive experimentation based on 300 test problems. The results are analyzed and discussed.

Related Topics
Physical Sciences and Engineering Engineering Computational Mechanics
Authors
,