Multi-Mode Resource Constrained Project Scheduling Problem and material batch ordering for construction project are integrated to help project manager consider various trade-offs among several costs, such as renewable resources’ cost, material price, ordering cost, back-ordering cost, inventory holding cost and reward/penalty for early/late project completion. Therefore, we prove a mixed integer programming model and impel to calculate inventory holding cost and back order cost in objective function. Moreover, a hybrid algorithm combined adapted harmony search and genetic algorithm is proposed correspondingly. In order to inherit elitist solution and maintain population’s diversity simultaneously, we add a selection operator when the harmony memory is initialized and modify the replacement operator based on distance. Besides, genetic algorithm is adopted based on a ‘012’ coding scheme. Finally, algorithm and model performance is presented and several project instances are provided with different network structures and realizations to discuss the factors on total cost.

Related Topics
Physical Sciences and Engineering Engineering Computational Mechanics
Authors
,