Article ID Journal Published Year Pages File Type
1704159 Applied Mathematical Modelling 2014 5 Pages PDF
Abstract

This paper revisits two previous studies that addressed the integrated production–inventory problem for deteriorating items in a two-echelon supply chain, where the item’s deterioration rate is a constant or follows a continuous probability distribution function. The aim of this study is to present an improved solution procedure to determine the delivery lot size and the number of deliveries per production batch cycle that minimizes the total cost of the entire supply chain. The performance of the proposed methodology is illustrated analytically and numerically.

Related Topics
Physical Sciences and Engineering Engineering Computational Mechanics
Authors
,