Article ID Journal Published Year Pages File Type
1704387 Applied Mathematical Modelling 2013 6 Pages PDF
Abstract

Recently, Chiu et al. (2012) [1] present an alternative optimization procedure to derive the optimal replenishment lot size for an economic manufacturing quantity (EMQ) model with rework and multiple shipments. This inventory model was proposed by Chiu et al. (2011) [2]. Both papers do not consider the determining of the number of shipments. This paper determines both the optimal replenishment lot size and the optimal number of shipments jointly. The solution of this paper is better than the solutions of Chiu et al. [1] and [2].

Related Topics
Physical Sciences and Engineering Engineering Computational Mechanics
Authors
, , ,