Article ID Journal Published Year Pages File Type
1704480 Applied Mathematical Modelling 2013 9 Pages PDF
Abstract

This paper extends an integrated model of economic production quantity (EPQ) and preventive maintenance (PM) to incorporate possibilities of minimal repair and rework. Our model determines simultaneously the optimal number of inspections, the inspection interval, the EPQ, and the PM level. Numerical examples of Weibull shock models are given to show that allowing minimal repair and rework will raise the expected profit. Our analyses demonstrate that both minimal repair and rework significantly influence the optimal policy.

Related Topics
Physical Sciences and Engineering Engineering Computational Mechanics
Authors
,