Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
1704759 | Applied Mathematical Modelling | 2011 | 5 Pages |
Abstract
The purpose of this paper is to point out that the programming model proposed by Eren [A bicriteria m-machine flowshop scheduling with sequence-dependent setup times, Appl. Math. Model. 34 (2010) 284–293] is incorrect. We propose a mixed 0–1 programming model for the same scheduling problem based on their model.
Related Topics
Physical Sciences and Engineering
Engineering
Computational Mechanics
Authors
Dehua Xu, Yunqiang Yin,