Article ID Journal Published Year Pages File Type
1705297 Applied Mathematical Modelling 2013 6 Pages PDF
Abstract

This paper studies the two-agent scheduling on an unbounded parallel-batching machine. In the problem, there are two agents A and B with each having their own job sets. The jobs of a common agent can be processed in a common batch. Moreover, each agent has an objective function to be minimized. The objective function of agent A is the makespan of his jobs and the objective function of agent B is maximum lateness of his jobs. Yazdani Sabouni and Jolai [M.T. Yazdani Sabouni, F. Jolai, Optimal methods for batch processing problem with makespan and maximum lateness objectives, Appl. Math. Model. 34 (2010) 314–324] presented a polynomial-time algorithm for the problem to minimize a positive combination of the two agents’ objective functions. Unfortunately, their algorithm is incorrect. We then dwell on the problem and present a polynomial-time algorithm for finding all Pareto optimal solutions of this two-agent parallel-batching scheduling problem.

Related Topics
Physical Sciences and Engineering Engineering Computational Mechanics
Authors
, , , ,